INSP-Sprinkler Rough-in/Hydro | 1/24/2018 | 1/25/2018 | 1/25/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for newly installed overhead fire sprinkler piping witnessed, no pressure loss observed at contractor provided gauge.
|
INSP-Sprinkler Rough-in/Hydro | 1/23/2018 | 1/24/2018 | 1/24/2018 | P | FAIL |
Troy Cobbley
|
|
|
Hydro test failed due to a leaking coupling
Nate Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | PART |
Troy Cobbley
|
|
|
Rough-in for the most part is ok. Tim approved the 1/2" heads being used. Will need sprinkler coverage under both stairs since the areas are being used for storage. Also possibly need coverage under the coveyor since it is also being used for storage. A hydro test wil also be needed as discussed.
Nate Phone #: ###-####
|