INSP-Final Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/7/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete.
|
INSP-Sprinkler Rough-in/Hydro | 12/26/2017 | 12/26/2017 | 12/26/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for area of work, approved for cover.
|