INSP-Final Inspection | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Jim Page
|
|
|
Final inspection for area of work complete.
|
INSP-Supply line flush | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | DONE |
Jim Page
|
|
|
Underground supply flush complete.
|
INSP-Sprinkler Rough-in | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining underground complete, approved for cover.
|
INSP-Sprinkler Rough-in | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete, IBR , change of direction with thrust block and approximately 20 feet of pipe approved for cover. Remaining pipe to be installed at a later date.
|