INSP-Final Inspection | 7/12/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 7/11/2018 | 7/12/2018 | 7/12/2018 | P | FAIL |
Troy Cobbley
|
|
|
Ceiling tile not installed yet. Interconnect with the fire alarm system was incorrect. Need forward flush test.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Corrections made on overspaced sprinklers. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PART |
Troy Cobbley
|
|
|
Pendant heads exceed 7' from wall in acouple locations. Final locations of these heads can be verified at final. Piping is ok for cover/rough-in passed.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | CANC |
Troy Cobbley
|
|
|
Wrong permit number scheduled
|
INSP-Sprinkler Rough-in/Hydro | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | CANC |
Troy Cobbley
|
|
|
Wrong permit number scheduled.
|
INSP-Sprinkler Rough-in | 2/9/2018 | 2/12/2018 | 2/12/2018 | P | CANC |
Troy Cobbley
|
|
|
Mike Martin is the contact for this inspection. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|