Permit Information
Permit NumberFIR18-00079
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1262 E EXCHANGE ST
Project NameCHARLIES PRODUCE TI
Customer Number 
ePlanReviewYes
Description
[Charlie's Produce]
The fire sprinkler scope of work consists of a space being converted to a freezer. The existing upright piping and sprinklers will remain. A new ceiling is being added at 16’. New dry pendent sprinklers will be supplied from the existing branch lines. The existing system is a 4”x 2½” x 1½” grid

Location on Plan - Top Left
Commodity - Fruit is corrugated containers
Classification - III
Storage Type (rack, solid pile, etc.) - Rack
Pallet Type (wood or plastic) - Wood
Aisle Width - 8’
Height of Storage - 16’
Ceiling Height - 17’-10”
Encapsulated - No
Solid Shelves - No
Smoke and Heat Vents - No
Draft Curtain - No
In Rack Sprinklers - No
Sprinkler Type - K=8.0, RA6112
High Temperature Sprinklers Required - Yes
Applicable NFPA Section - T 16.2.1.3.2, (c), Curve E, 16.2.1.3.4.1
Hydraulic Design Criterion - .37/2000, 65%, .24/2000
Hose Stream Requirements - 500

[BLD17-04372]
Permit for the installation of new 16-foot-tall steel storage racking per the approved plans the occupancy evaluation was completed under BLD17-03958. Storage will be single and double row steel racking utilizing wood pallets. This building is fully fire sprinklered; separate fire protection permits will be required for any modifications to the existing fire protection systems. SJA

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/13/20186/14/20186/14/2018APASS
DetailsJim Page
Freezer has been removed, final fire sprinkler inspection for area of work complete.

Rick Fry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Final Inspection3/15/20183/16/20183/16/2018APART
DetailsJim Page
Final fire sprinkler inspection for scope of work complete. A walk in freezer is located inside of the cooler, walk in freezer does not have fire sprinklers installed, freezer may possibly be removed, FIR permit for fire sprinklers cannot be finaled until freezer has sprinklers installed or until the freezer is removed.
INSP-Sprinkler Rough-in3/15/20183/16/20183/16/2018APASS
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping in scope of work complete.