INSP-Final Inspection | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Troy Cobbley
|
|
|
Overhead rough-in passed. Overhead hydro test passed. Piping can be covered
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PART |
Troy Cobbley
|
|
|
Of the two systems the north side passed the overhead hydro. The south side system failed due to visable loss at the guage.
Please call Anthony before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|