Permit Information
Permit NumberFIR18-00141
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3044 S OWYHEE ST
Project NameOwyhee Park Apartments #3044
Customer Number 
ePlanReviewYes
Description
[Owyhee Park Apartments - Building #3]
The fire sprinkler scope of work consists of a new 2”x350’± polypipe underground which supplies a new 1¼” riser with floor level control valves; to protect a two-level four-unit apartment building.

Plan Mod #1 – 2/27/2018
Added sprinkler to the bathrooms and exterior mechanical rooms.

[BLD17-02479]
Bldg. #3 units (101-102 & 201-202) Permit for the construction of a new two-story, four-unit apartment building with work to include general site work and construction of the building per the approved plans. This building is fully fire sprinklered with and NFPA 13r system. CDM

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/29/20186/29/20186/29/2018PPASS
DetailsTroy Cobbley
Permit finaled

Coltin Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro5/30/20185/30/20185/30/2018PPASS
DetailsTroy Cobbley
The hydro test for the FDC passed.

Colton Cox is the contact for this FDC Hydro inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/23/20185/29/20185/30/2018PCANC
DetailsTroy Cobbley
Wrong building was scheduled.

Colton Cox is the contact for this rough-in on 6 units. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection4/27/20184/30/20184/30/2018AFAIL
DetailsTroy Cobbley
Need to pass the hydro test on the FDC

Robert would like this inspection at 11AM, if possible. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro4/27/20184/30/20184/30/2018AFAIL
DetailsTroy Cobbley
Overhead hydro test for the first and second floor systems passed. The hydro test for the FDC failed due to visible leakage on exterior wall
INSP-Supply line flush4/5/20184/5/20184/5/2018PPASS
DetailsTroy Cobbley
Underground supply line flush passed
INSP-Sprinkler Rough-in2/26/20182/28/20182/28/2018APASS
DetailsTroy Cobbley
Piping rough-in and tenting inspection passed. Piping can be covered.