INSP-Final Inspection | 3/28/2018 | 3/29/2018 | 3/29/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Final Inspection | 3/15/2018 | 3/16/2018 | 3/16/2018 | A | FAIL |
Jim Page
|
|
|
Tamper switchs and flow switch worked correctly, FDC identification plate needs installed on FDC connection, overhead doors need fire sprinkler protection installed underneath.
|
INSP-Final Inspection | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | CANC |
Jim Page
|
|
|
Please schedule for late AM (11ish) Roy Nelson Phone #: ###-#### >> Inspection requested via web by Nathan Stenquist Inspection cancelled from web by: Nathan Stenquist
|