INSP-Final Inspection | 6/12/2018 | 6/13/2018 | 6/13/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 6/6/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping associated with the conveyor system complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping associated with the Conveyor System sprinklers witnessed, no pressure loss observed at riser provided gauges.
Mike Bierman is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PART |
Jim Page
|
|
|
Partial rough in inspection for sprinkler protection under conveyors complete.
Mike Bierman will be the contact for this partial Rough-in inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|