INSP-Final Inspection | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for dry system complete.
|
INSP-Sprinkler Rough-in/Hydro | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | DONE |
Jim Page
|
|
|
24 hour air test witnessed, no pressure loss observed at dry pipe valve provided gauge.
|
INSP-Sprinkler Rough-in | 4/20/2018 | 4/23/2018 | 4/23/2018 | A | PART |
Jim Page
|
|
|
24 hr air test started at 1230PM @ 40PSI
|
INSP-Final Inspection | 4/17/2018 | 4/20/2018 | 4/20/2018 | A | FAIL |
Jim Page
|
|
|
Final inspection will not be performed until completion of 24 hour air test.
|
INSP-Sprinkler Rough-in | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | PASS |
Jim Page
|
|
|
Rough in inspection for area of work complete.
|
INSP-Sprinkler Rough-in/Hydro | 4/9/2018 | 4/10/2018 | 4/10/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
|