INSP-Final Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Jim Page
|
|
|
Fianl fire sprinkler inspection complete.
|
INSP-Final Inspection | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for level 3 fire sprinklers complete. Level 2 inspection to be completed at a later date.
3rd floor- Randy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/1/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, level 2 approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for level 2 witnessed, no pressure loss observed at riser provided gauge.
2nd floor- Randy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above level 2 hardlids complete, hardlids on level 2 approved for cover.
Please call ahead for access - Randy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for level 3 complete, level 3 approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping on level 3 witnessed, no pressure loss observed at riser provided gauge.
Early as possible // Randy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids complete, notated city approved drawings areas approved for cover.
|