INSP-Final Inspection | 6/1/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. This scope of work was for phase 1
Please set for as early as possible. Tony Burtlow is the Tech on Site. Phone #: ###-#### Inspection requested via web by David Oliver
|
INSP-Final Inspection | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | FAIL |
Troy Cobbley
|
|
|
As-builts are needed showing the candella changes and address changes. One strobe is missing as noted on the plans. For a final the notification circuit needs tested, as-builts, correct batteries, document box, breaker lock, manual pull stations in the adjacent restraunt relocated and tested.
|
INSP-Final Inspection | 5/31/2018 | 6/1/2018 | 5/31/2018 | P | CANC |
Troy Cobbley
|
|
|
Tony Burtlow is our Technician on site. Phone #: ###-#### >> Inspection requested via web by David Oliver Inspection cancelled from web by: David Oliver
|