Permit Information
Permit NumberFIR18-00240
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 10499 W FAIRVIEW AVE
Project NameAce Hardware Canopy Dry system
Customer Number 
ePlanReviewYes
Description
[Ace Hardware Canopy Dry System]
The fire sprinkler scope of work consists of replacing an antifreeze system in the exterior canopy/storage with a new dry system for Ordinary Hazard II.

[BLD17-04218]
Permit to remodel an existing 17,744 sq ft retail tenant space within the existing Belmont Plaza. The building was previously occupied by K-Mart and subdivided into smaller tenant spaces under shell/core permit BLD17-01449. Work to include: demo of interior non-structural partitions; new interior non-bearing walls; new entry vestibule doors; new exterior doors; new break room plumbing; new lighting and power; mechanical; and new interior finishes in compliance with Ch. 8 of the 2012 IBC. Special inspections required per attached Form 310. Separate racking permit required for any racking over 8’-0” tall. The fire sprinkler system is used for unlimited area of the building AND to allow 3-hr fire barrier walls in lieu of fire walls. The fire sprinkler system is NOT allowed to be used for building area increase for A Occupancies. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. **JAR**

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/26/20184/27/20184/27/2018PPASS
DetailsTroy Cobbley
Permit finaled

Brian Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro4/17/20184/18/20184/18/2018PPASS
DetailsTroy Cobbley
24 hour air test on dry system passed

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro4/17/20184/17/20184/17/2018PPASS
DetailsTroy Cobbley
The overhead 200lb hydro on new dry system passed. The 24 hour air test was started at 1:40 with 44psi on the guage.