INSP-Final Inspection | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type scheduled.
|
INSP-Final Inspection | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | CANC |
Jim Page
|
|
|
Paint booth is not ready for final inspection, this request is cancelled.
Phone #: ###-#### Inspection requested via web by Eric Stanley
|
INSP-Final Inspection | 4/30/2018 | 5/2/2018 | 5/3/2018 | P | PART |
Troy Cobbley
|
|
|
Functionality fo the sppression system tested. As-builts received. Will be able to final when a life safety inspection is passed for the paint booth itself.
Nate Phone #: ###-####
|