Permit Information
Permit NumberFIR18-00256
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 4095 S GEKELER LN
Project NameAce Co Gekeler
Customer Number 
ePlanReviewYes
Description
A new HVAC building is being built outside of the main building and will need a dry system to protect it. It is only 732 sqft and will only require 6 sprinklers.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/9/20185/11/20185/11/2018APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Final Inspection5/4/20185/8/20185/8/2018ACANC
DetailsJim Page
Final inspection cancelled per conversation with point of contact, inspection request will be rescheduled for a later date.

air test Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro5/8/20185/8/20185/8/2018ADONE
DetailsJim Page
24 hour air test witnessed, no pressure loss observed at contractor provided gauge.
INSP-Sprinkler Rough-in/Hydro5/4/20185/7/20185/7/2018APART
DetailsJim Page
24 hour air test started at 1030AM with 50 psi.

air test Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro5/2/20185/4/20185/4/2018ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at contractor provided gauge.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Final Inspection5/2/20185/4/20185/4/2018ACANC
DetailsJim Page
Final fire sprinkler inspection for dry system cannot be completed until 24 hour air test is perfromed and passed, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Matthew Lewis