INSP-Final Inspection | 9/12/2018 | 9/13/2018 | 9/19/2018 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
Meet Mike At 7:30 Phone #: ###-#### Inspection requested via web by David Oliver
|
INSP-Final Inspection | 9/11/2018 | 9/12/2018 | 9/19/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled 9/13/18
Please meet at 7 am. Mike Hull and Brian Richard are the Techs on site. Phone #: ###-#### Inspection requested via web by David Oliver
|
INSP-Alarm Testing | 9/13/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Lee G Meredith
|
|
|
Manual station that was moved to properlocation tested for function and activation of notification. Testing complete. As built drawings and record of completion received.
|
DOC - Permit Finaled | | | 9/13/2018 | | DONE |
|
|
|
System passed inspection all required documents provided.
|
INSP-Final Inspection | 8/29/2018 | 8/31/2018 | 8/31/2018 | A | CANC |
Troy Cobbley
|
|
|
I could not make the time as needed by the contractor and the as-builts had not been approved yet.
Please Schedule for as close to 7am as possible to accommodate the tenants. Thank you.
Dave. ###-#### Phone #: ###-#### Inspection requested via web by David Oliver
|
INSP-Final Inspection | 7/20/2018 | 7/24/2018 | 7/24/2018 | A | FAIL |
Troy Cobbley
|
|
|
No actual testing was performed today. We did however perform a walk through and I noted strobes that are overspaced and acouple that are nmissing. There is a restroom in the northwest corner of the building that needs notification. There is a strobe in a restroom that is not shown on the plans. Several trobes are mounted too low. Several pull stations are mounted too high. As-builts need to be submitted. Plan reviewer may require plan modifications. See the city approved plans for corrections marked in red ink.
Requesting an Early inspection at 7:00 due to Businesses operating hours, please. Phone #: ###-#### Inspection requested via web by David Oliver
|