INSP-Final Inspection | 1/2/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler for core and shell only complete, TI work is currently in progress under seperate permits.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Final Inspection | 12/27/2018 | 12/28/2018 | 12/28/2018 | P | FAIL |
Jim Page
|
|
|
Multiple heads blocked in basement level. Could not test basement flow switch due to sump pump no keeping up with water flow. Exposed combustible material in basement level with no sprinkler protection.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Final Inspection | 12/27/2018 | 12/28/2018 | 12/27/2018 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Matthew Lewis
|
INSP-Sprinkler Rough-in/Hydro | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping on levels 1 and 5 witnessed, no pressure loss observed.
5th floor Hydro Test. Phone #: ###-#### Inspection requested via web by Randy Knutson
|
INSP-Sprinkler Rough-in/Hydro | 12/6/2018 | 12/10/2018 | 12/10/2018 | P | PART |
Jim Page
|
|
|
Hydrostatic test for levels 2, 3 and 4 witnessed, no pressure loss observed. Levels 1 and 5 to be completed at a later date.
Leon Taylor is the contact Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
Troy Cobbley
|
|
|
5th floor bathroom and Lobby, see marked approved plans, piping is ok to cover.
|
INSP-Sprinkler Rough-in | 10/31/2018 | 11/5/2018 | 11/5/2018 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact.
Complete Rough-In for 2nd through 5th floor. Call Leon Taylor @ ###-#### Phone #: ###-#### Inspection requested via web by Sheldon Gray
|
INSP-Sprinkler Rough-in/Hydro | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PART |
Jim Page
|
|
|
Hydrostatic test for stairwell standpipes, underground supply and basement system witnessed, no pressure loss observed. Levels 1 through 5 to be completed when heat can be maintained at 40 degrees or above on mentioned floors.
Hydro on the basement feed and Underground coming into the basement. Hydro on both standpipes. Call Patrick @ ###-#### Phone #: ###-#### Inspection requested via web by Sheldon Gray
|
INSP-Supply line flush | 10/11/2018 | 10/16/2018 | 10/16/2018 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
SUEZ will be there at 7am to flush the underground with Steve V. ###-####. Phone #: ###-#### Inspection requested via web by Sheldon Gray
|
INSP-Sprinkler Rough-in | 10/10/2018 | 10/11/2018 | 10/11/2018 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping on basement level complete, cover is not approved at this time.
Basement rough-in. Call Steve V. ###-#### Phone #: ###-#### Inspection requested via web by Sheldon Gray
|
INSP-Sprinkler Rough-in | 10/8/2018 | 10/10/2018 | 10/10/2018 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping on level 1 complete, cover is not approved at this time.
1st Floor rough-in. Call Steve V. ###-#### Phone #: ###-#### Inspection requested via web by Sheldon Gray
|
INSP-Sprinkler Rough-in | 9/25/2018 | 9/26/2018 | 9/26/2018 | P | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping on levels 4 and 5 complete, cover is not approved at this time.
Rough-In for 4th and 5th floors. Call Steve Vaughn - ###-#### Phone #: ###-#### Inspection requested via web by Sheldon Gray
|
INSP-Sprinkler Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Adele J Schaffeld-Griffin
|
|
|
Rough-in for Bathrooms on 1st and 4th floors. approved for cover by Ron Johnson. Phone #: ###-#### >> Inspection requested via web by Sheldon Gray
|
INSP-Sprinkler Rough-in | 9/7/2018 | 9/10/2018 | 9/10/2018 | A | PASS |
Jim Page
|
|
|
Forrest Inspection results-Rough-in inspection completed for overhead fire sprinkler work at the 2nd and 3rd floor shell and core areas. Approval for ceiling cover at the 2nd
floor restrooms. Contractor to revise over-spacing at four branch lines in the calc area on the 2nd floor as discussed. 3” main re-route appears
acceptable. Two branch lines at the 3rd floor are not yet installed due to stair construction underway.
Rough-In Inspection for 2nd & 3rd floors. Phone #: ###-#### >> Inspection requested via web by Sheldon Gray
|
INSP-Sprinkler Rough-in | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Troy Cobbley
|
|
|
3rd Floor Bathroom Rough-In aboive hard lid only 4 pendent heads, not pressure test done, only ok to cover ceiling for FS. Phone #: ###-#### >> Inspection requested via web by Sheldon Gray
|
INSP-Sprinkler Rough-in | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above the restrooms on level 2 complete, approved for cover.
Call Steve Vaughn. Rough-in for 2nd floor. To cover in the bathrooms. Phone #: ###-#### Inspection requested via web by Sheldon Gray
|
INSP-Conference | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | DONE |
Jim Page
|
|
|
Fire conference for standpipe location complete.
for existing standpipe. Please call Randy ###-#### first and if no answer call Steven Vaughn at ###-#### Phone #: ###-#### Inspection requested via web by Matthew Lewis
|