INSP-Final Inspection | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Call Anthony to coordinate, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Jim Page
|
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
Tenting inspection, ready any time. Let Anthony know if there are any issues. Thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, piping lpocated between condioned spaces approved for cover, piping in the attic space will need a tenting inspection perfromed before cover will be approved.
|
INSP-Sprinkler Rough-in/Hydro | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss pbserved at riser provided gauge.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|