Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR18-00544
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2180 S HUDSON AVE
Project NameSkyline Apartments Bldg A
Customer Number 
ePlanReviewYes
Description
[Skyline Apartment Building A - Udg Only] - Quick Permit
Install a new 2" fire line into the new apartments building with 2" CPVC pipe and fittings. The full fire sprinkler submittal will follow at a later date.

[BLD17-04623]
The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1 hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/28/20193/28/20193/28/2019PPASS
DetailsJim Page
Final inspection for underground supply complete.

Gerardo Arce is the contact. This inspection has already been done, reach out to the contact for more information. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/6/20193/7/20193/7/2019ADONE
DetailsJim Page
Hydrostatic test witnessed for undergorund supply, no pressure loss observed.

Gabe Garduno is the contact for this underground hydro inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush3/5/20193/6/20193/6/2019ADONE
DetailsJim Page
Underground main line flush witnessed.

Gabe Garduno is the contact. This inspection is for a flush and hydro. Thank you for all that you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush1/24/20191/29/20191/29/2019AFAIL
DetailsJim Page
Point of contact could not be reached.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush11/8/201811/13/201811/13/2018PCANC
DetailsTroy Cobbley
Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018PCANC
DetailsTroy Cobbley
Problem with the hydro pump.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in8/17/20188/17/20188/17/2018PPASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/10/20187/11/20187/11/2018APART
DetailsJim Page
Partial rough to cover inspection complete for undergorund supply, stub up and approximately 12 feet of pipie approved for cover, remaining underground to be inspected at a later date.