INSP-Final Inspection | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
Gerardo Arce is the contact. This inspection has already been done, reach out to the contact for more information. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for undergorund supply witnessed, no pressure loss observed.
This is for an underground hydro only. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Gabe Garduno is the contact. This is inspection is for an flush and hydro. Thank you! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 11/8/2018 | 11/13/2018 | 11/13/2018 | P | CANC |
Troy Cobbley
|
|
|
Problem with hydro pump
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2018 | 11/13/2018 | 11/13/2018 | P | CANC |
Troy Cobbley
|
|
|
Problem with hydro pump
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | FAIL |
Jim Page
|
|
|
Piping not in place at time of inspection, inspection request will need to rescheduled, piping cannot be covered.
underground-Brian Phone #: ###-####
|