INSP-Final Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Jim Page
|
|
|
Plans mods have been approved, final fire alarm inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by david davis
|
INSP-Final Inspection | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PART |
Jim Page
|
|
|
Changes needed to be made for wall layout, a plan mod will be submitted for corrections. Function test performed, all worked correctly. Once plan mod is complete then permit for scope of work can be completed.
Please call half hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
INSP-Final Inspection | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | CANC |
Jim Page
|
|
|
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### >> Inspection requested via web by david davis Inspection cancelled from web by: david davis
|