DOC - Permit Finaled | | | 11/20/2019 | | DONE |
|
|
|
All requested documentation received and approved.
|
INSP-Final Inspection | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | FAIL |
Troy Cobbley
|
|
|
Permit will be ok to final when documents are provided to plan review that address the supervisory/rrouble on panel as per revios corretion
John Howard, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Final Inspection | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for a list of required corrections.
Earl Lasater, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
FIR-Aging Inspection | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type called in.
|
INSP-Alarm Testing | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | DONE |
Troy Cobbley
|
|
|
Earl and I did a walk through of the Basement, first floor and second floor corridor system and verified horn/strobe spacing/height.
|
INSP-Final Inspection | 1/15/2019 | 1/16/2019 | 1/16/2019 | P | FAIL |
Troy Cobbley
|
|
|
No testing of devices performed today. Inspection was only for the Basement area. Plan modifications are needed showing the correct form of communication, fire sprinkler riser device count (delete dry system), strobes are too low, wall and ceiling mount devices do not corrispond with the plans, Storage Room needs notification device modifications, batteries in the FACP do not match plans. We discussed the function of the Basement duct smoke detectors in the Mechanical Room.
Earl Lasater, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|