INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Nick Phone #: ###-####
|
INSP-Final Inspection | 8/21/2019 | 8/22/2019 | 8/22/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need insulation and cover inspection for the piping in the storage closets.
Call ahead to Nick @ ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan (change inspection to this afternoon, 8-22, per kristin dolan)
|
INSP-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kristin Dolan Inspection cancelled from web by: Kristin Dolan
|
INSP-Sprinkler Rough-in/Hydro | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test witnessed with no visible loss on the guage. Todd Phone #: ###-####
|
INSP-Supply line flush | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Troy Cobbley
|
|
|
Underground flush witnessed
Nick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PART |
Troy Cobbley
|
|
|
Rough-in and tenting inspection passed. Plan modifications are needed showing the correct addrss (not building A), the additional pendant heads and pipe size changes prior to a final sign off. Also there were not review comments on site. These notes are required. No additional inspections on the remaining building will be given without the notes. If the notes require anything that has not been previously addressed it is the contractors responcibility to provide the changes at their cost. I let the general contractor know this as a condition for cover on this building. Piping is ok for cover.
Christen Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | FAIL |
Troy Cobbley
|
|
|
The job site gate is locked so no inspection was performed.
Approved plans will be onsite in building A where the inspection will occur. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|