INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Nick Phone #: ###-####
|
INSP-Final Inspection | 8/21/2019 | 8/22/2019 | 8/22/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need insulation and cover inspection for the piping in the storage closets.
Nick Phone #: ###-#### (change inspection to this afternoon, 8-22, per kristin dolan)
|
INSP-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | FAIL |
Jim Page
|
|
|
Provide freeze protection for fire sprinkler piping in storage closets. Storage closets have exposed CPVC, exposed CPVC is not allowed per manufacture specs. Provide signage for FDC bell as required.
Kristin Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/6/2019 | 5/6/2019 | 5/6/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered. The wet pipe in the exterior closets will need addressed as per previous conversations.
###-#### Nick
|
INSP-Sprinkler Rough-in/Hydro | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test was witnessed with no visible loss at the guage. Todd Phone #: ###-####
|
INSP-Supply line flush | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Troy Cobbley
|
|
|
Underground flush witnessed
Call ahead // Nick Phone #: ###-####
|