INSP-Final Inspection | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | A | PART |
Jim Page
|
|
|
Partial final complete for fire alarm inspection. Initiating devices and audio visual devices tested, last item to test will be FDC bell after install.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 11/18/2019 | 11/19/2019 | 11/18/2019 | A | CANC |
Jim Page
|
|
|
Please contact Buck for Inspection. Phone #: ###-#### >> Inspection requested via web by Ken Webster Inspection cancelled from web by: Ken Webster
|
INSP-Conference | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, city approved plans have been notated for the minor corrections required.
FIRE ALARM Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Conference | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PART |
Jim Page
|
|
|
Fire conference partially complete, walked level 1 and basement level, technician on site has a few minor corrections, will verify corrections on final walk through, still need to perform walk through on level 2.
hone #: ###-#### Inspection requested via web by Ken Webster
|