INSP-Final Inspection | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
sprinkler final // Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with red ink areas approved for cover.
Tom Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/9/2019 | 5/10/2019 | 5/10/2019 | P | CANC |
Troy Cobbley
|
|
|
Not all work was complete. To be rescheduled.Tom Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas on the second floor where piping is ok for cover. Tom and I went over sprinkler coverage in/below the clouds.
Tom Phone #: ###-####
|