INSP-Final Inspection | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Troy Cobbley
|
|
|
Hydro test witnessed with no visible loss on the guage.
Gabe Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | FAIL |
Troy Cobbley
|
|
|
Hydro test failed due to visible loss on the guage.
|
INSP-Sprinkler Rough-in | 3/15/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Gabe and I spoke about cpvc riser requirements.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|