INSP-Final Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Jim Page
|
|
|
As-builts match install, final fire alarm inspection complete.
This was already finaled by Jim Page, just needed the plan mod to be approved. This was approved and should be signed off on without a second walk through. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | PART |
Jim Page
|
|
|
Fina fire alarm inspection for scope of work complete, awaiting plan mod approval for final sign off.
(plan mod in process)
Ron ###-####
|