INSP-Final Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Call Troy with time frame.
Thank you and a have a great day. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 4/17/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping associated with this system witnessed, no pressure loss observed.
Please Cordinate inspection with Troy Nelson Thanks Phone #: ###-#### Inspection requested via web by Christophe Wilson
|