INSP-Final Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Jim Page
|
|
|
Previouly noted items have bee corrected, head box not required per NFPA 13D, section 5.1.1.2, final fire sprinkler inspection is complete.
Please call Troy Nelson for inspection time. Currently the bell is working. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
INSP-Final Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | FAIL |
Jim Page
|
|
|
Provide head box with head wrench and correct number of spare heads. Circuit breaker for flow switch tripped with flow switch activation, could not get bell to operate, bell operation will need to be repaired.
Adam Phone #: ###-####
|
INSP-Final Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | CANC |
Troy Cobbley
|
|
|
Could not perform inspection due to time constraints. Please call troy with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Jim Page
|
|
|
All tenting in place at time of inspection, cover for overhead fire sprinkler piping approved, sticker for cover approvel placed on window with other trade associated stickers.
This a rough-in inspection for tenting. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
INSP-Sprinkler Rough-in | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping located between conditioned spaces approved for cover, piping requiring tenting to be inspected at a later date. Piping requiring tenting not approved for cover.
Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|