INSP-Final Inspection | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Troy Cobbley
|
|
|
permit finaled.
Call Jeff if there are questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PART |
Troy Cobbley
|
|
|
Fire sprinkler work in the new restrooms is complete.
|
INSP-Sprinkler Rough-in | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the two rooms. Combustible concealed spaces are full of insulation. Piping can be covered.
Kerry Turner Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|