INSP-Final Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Troy Cobbley
|
|
|
Underground Finaled.
Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Supply line flush | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Schedule with Troy for time to meet with Suez. Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Troy Cobbley
|
|
|
The underground supply piping hydro test was witnessed with no pressure loss.
Please call Troy with time frame. UG Hydro Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Troy Cobbley
|
|
|
Underground Rough-in passed. Piping can be covered. Troy Nelson Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|