INSP-Final Inspection | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PART |
Troy Cobbley
|
|
|
A temporary for this permit is being given until an upgrade agreement has been finalized with the Boise Fire Dept for the fire alarm system.
This inspection needs to be before 7:30 am as this is a school and they will be in session. Please call ahead to Brian @ ###-####. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | FAIL |
Troy Cobbley
|
|
|
FIre smoke damper did not function when smoke detector activated. Both dampers will need to be tested. Per Boise Fire a temp for fire alarm will be ok, when dampers function, until the fire alarm upgrade agreement is finalized. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | FAIL |
Mark Scharfen
|
|
|
CO/Supervisory monitoring is not tied into AES, has not been pretested. Had conversation with technician. Will need to be scheduled after system has been properrly pretested.
end of day inspection if possible. please call ahead to coordinate. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 8/12/2019 | 8/14/2019 | 8/14/2019 | P | CANC |
Mark Scharfen
|
|
|
Last call of the day if possible. Phone #: ###-#### >> Inspection requested via web by Kristin Dolan Inspection cancelled from web by: Kristin Dolan
|