INSP-Final Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection for area of work complete.
Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/3/2019 | 10/7/2019 | 10/7/2019 | A | FAIL |
Troy Cobbley
|
|
|
Still need to remove the tape from the heads.
Jon Beazer is the contact. It doesn''t matter what time of day this inspection takes place. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | FAIL |
Troy Cobbley
|
|
|
Remove tape from heads, in a southwest office it appears a new upright head is blocked by round duct, in a northwest office a pendant head exceeds 9'-0" from a wall, an upright head needs to be added as per plans above a cloud ceiling assembly as marked on the plans.
Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|