INSP-Final Inspection | 8/20/2019 | 8/21/2019 | 8/20/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for area of work complete, notated city approved drawings areas approved for cover.
Mike Phone #: ###-####
|