INSP-Final Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection is complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 3/23/2020 | 3/23/2020 | 3/23/2020 | A | FAIL |
Jim Page
|
|
|
Bell needs to be moved closer to front of house as discussed. Could not rest irrigation shutdown during water flow, no zones hooked up.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 11/12/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, rough to cover inspection for overhead fire sprinkler piping complete, foam insulation has been placed in the top cord pockets above the sprinkler piping so no tenting installed, cover is approved. Official hydro to be completed at a later date after permenant heat is established and operational as discussed.
Overhead rough, hydro, tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | FAIL |
Jim Page
|
|
|
Install does not match city approved drawings, notated about 6 areas on the city approved drawings, inspection was stopped.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | CANC |
Troy Cobbley
|
|
|
Per conversation with the field superintendant plan modifications are needed showing the changes prior to a rough-in inspection. No inspectio was performed.
Ready any time. Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|