INSP-Final Inspection | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection is complete.
2 Heat detectors have been installed in the penthouse per the alternate agreement to allow fire sprinklers to be omitted from penthouse.
Call ahead as I am not sure which tech will still be onsite. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | FAIL |
Jim Page
|
|
|
Provide coverage in shadow area that is marked on city approved drawings. Provide city approved drawings for addition of heat detector in penthouse, penthouse is not shown on city approved drawings. Relocate A/V device that is blocked by ductwork. Access control system was not active at time of inspection, could not test mag lock release on general fire alarm.
Call ahead to Brian @ ###-####. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | FAIL |
Jim Page
|
|
|
As discussed with Kristen, battery fault was suppose to repaired with last tenant, battery fault was not repaired, as of this entry battery fault was still on panel, Kristen was informed that if fault was still on panel then inspection request would be a fail.
Damien Phone #: ###-####
|