INSP-Final Inspection | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, as-builts will be sent to fire alarm plan reviewer. Final fire alarm inspection complete.
Paint Booth Shut-Down. Phone #: ###-#### Inspection requested via web by Robert Gobler
|
INSP-Final Inspection | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PART |
Jim Page
|
|
|
Partial final for fire alarm inspection complete, riser monitoring has been completed, need to have exhaust fan on paint booth needs to shut down during general fire alarm.
Phone #: ###-#### Inspection requested via web by Robert Gobler
|
INSP-Final Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled to coincide with fire sprinkler inspection on 08AUG2019, this request cancelled per conversation with point of contact.
Phone #: ###-#### Inspection requested via web by Robert Gobler
|