INSP-Final Inspection | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Jim Page
|
|
|
Forward flush is complete, final fire sprinkler inspection is complete.
Kenny Caldwell is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection is complete. Last remaining item to complete is the forward flow test, pitot tube not available at time of inspection.
Kenny Caldwell is the contact. The inspection is already being done this morning. Thanks (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 2/10/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Troy Cobbley
|
|
|
The piping in the Kitchen area is ok for cover. Three EQ braces will be verified at next inspection.
Kenny Caldwell Is the Contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test witnessed.
Kenny Caldwell is the field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed but this is the wrong permit number. Actual permit is FIR19-00365 and an entry has been made there.
Kenny Caldwell will be the contact. Stacey with the water will be there between 10 and 10:30 AM. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 1/27/2020 | 1/29/2020 | 1/29/2020 | A | PASS |
Troy Cobbley
|
|
|
Overhead rough-in, branchlines/hangers, for the Kitchen area passed. An additional cover inspection will be needed when T-bar has been installed. Kenny Caldwell is the contact. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PASS |
Troy Cobbley
|
|
|
All piping is now ok for cover except the Kitchen area which is not complete.
Kenny Caldwell is the contact for this RTC inspection. We appreciate you help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 1/3/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans with room locations marked "ok" where piping is ok for cover. ] Kenny Caldwell is the contact for this RTC Inspection. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/10/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for rooms marked "ok" where piping is ok for cover.
Kenny is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 11/19/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Troy Cobbley
|
|
|
The piping above the third floor corridor soffits is ok to cover. Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/17/2019 | 10/21/2019 | 10/21/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Kenny Caldwell. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/2/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Troy Cobbley
|
|
|
Corrections have been made at the two restrooms. Also see the city approved plans for an additional area where the rough-in has passed dated today. Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for area where branchline and main rough-in took place. I noted that upright sprinkler heads are overspace at two restroom locations if the sheet rock goes to the deck. Kenny Caldwell is the contact for this rough to cover inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Troy Cobbley
|
|
|
The four combustible concealed spaces in the south will are ok to cover. Sprinkler protection has been added. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/20/2019 | 9/23/2019 | 9/23/2019 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for today inspection area. Has been marked on the plans and dated. I noted combustible concealed spaces in the corridor above each of the classroom doors that will need to be addressed before a cover approval is given. Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|