INSP-Final Inspection | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | CANC |
Troy Cobbley
|
|
|
*Inspection was done on 9/16/2019* MAS**
Charles Lamb is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Troy Cobbley
|
|
|
*Passed * MAS**
Charles Lamb is the contact for this final inspection. He would like the soonest time slot you have. We appreciate your help. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 9/3/2019 | 9/6/2019 | 9/6/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need the existing insulation secured back to the deck, need ceiling tile and T bar installed. I also noted that two heads outside of the scope of work are not the min. 6' apart. This will need to be addressed prior to a final building sign off. Kyle Koepnick is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|