Permit Information
Permit NumberFIR19-00624
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2855 W LOCKHEED LN
Project NameARFF PHASE 5
Customer Number 
ePlanReviewYes
Description
**QUICK PERMIT** SHILO WILL ADD 8 PENDENT HEADS TO AND EXISTING WET SYSTEM IN THE FEDEX PORTION OF THE ARFF BUILDING AT THE BOISE AIRPORT. THE DRY SYSTEM SHALL NOT BE ALTERED. NO EXISTING LINES AND MAINS SHALL BE MOVED.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/5/201911/5/201911/5/2019PPASS
DetailsTroy Cobbley
Permit finaled.

Todd Ketterling is the field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/4/201911/5/201911/5/2019APASS
DetailsTroy Cobbley
Rough-in passed. Piping can be covered.

Todd Ketterling is the field contact Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in9/25/20199/26/20199/26/2019APASS
DetailsTroy Cobbley
The piping to the two heads in the hard lids is ok for cover. Todd Phone #: ###-####