INSP-Final Inspection | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Adien Phone #: ###-####
|