INSP-Final Inspection | 3/13/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | CANC |
Troy Cobbley
|
|
|
Still waiting for Delta to provide permit for the fire alarm work performed in the other portions of the building. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide plan mods showing the two changes of the wall mouted strobes to higher candella. Provide sync'ing of the audible/horn as per NFPA 72 18.4.2.4 and 3.3.317.1.
We are requesting the final for 7:30 because there are several restaurants and businesses that could be affected when alarm is set off. Thank You. Phone #: ###-#### Inspection requested via web by Sam Ball
|