INSP-Final Inspection | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Plugged 4 sprinkler drops that were in the middle of nowhere. Spoke with Mark Stumbaugh and he had us do a design letter instead of drawings. Approved design letter and permit are on site in a folder at the front desk of the store. Phone #: ###-#### Inspection requested via web by Matt Barnard
|