INSP-Final Inspection | 2/11/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work is complete.
Needs to be done at 7:00 am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 2/10/2020 | 2/12/2020 | 2/11/2020 | A | CANC |
Jim Page
|
|
|
Needs to be done at 7:00am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for scope of work is complete, scope of work is approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|