INSP-Final Inspection | 6/11/2020 | 6/12/2020 | 6/12/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 6/10/2020 | 6/11/2020 | 6/11/2020 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled.
I''m doing this right now while I have time, but the super is still trying to coordinate with the alarm contractor to make sure they can be there tomorrow afternoon. I''ll let you know in the morning what he''s been able to find out. Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Sprinkler Rough-in | 5/16/2020 | 5/18/2020 | 5/18/2020 | A | PASS |
Troy Cobbley
|
|
|
Piping in kitchen, office, electrical room and coolers is ok for cover.
GC would like to begin installing ceiling tile in the kitchen area, so I need you to look at that area now that the heads are cut. Thanks. Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Sprinkler Rough-in/Hydro | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Troy Cobbley
|
|
|
The attic area sprinkler piping is ok for cover. Insulation backing needs repaired in one location but can be seen at the next inspection.
johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/20/2020 | 3/24/2020 | 3/24/2020 | A | PASS |
Troy Cobbley
|
|
|
The piping in all of the Dining area is ok for cover. Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | FAIL |
Troy Cobbley
|
|
|
I stopped at the project three times but the backing for the insulation is not done yet.
|
INSP-Sprinkler Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the high (tower) area is ok for cover.
Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Troy Cobbley
|
|
|
under ground and over head hydro tests witnessed. // Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PART |
Troy Cobbley
|
|
|
Insulation/backing installed in high ceiling area in the Dining/Seating area. Piping is ok for cover in this area. over head,, insulation // Johnathon Phone #: ###-####
|
INSP-Supply line flush | 3/11/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Troy Cobbley
|
|
|
Supply line flush witnessed.
johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/11/2020 | 3/13/2020 | 3/13/2020 | A | FAIL |
Troy Cobbley
|
|
|
Insulators anr not done with installing the insulation at the roof deck. Will need to be rescheduled.
johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Need to add one 4 way brace and possible additional branchline bracing as discussed. No piping to be covered until additional rough-in inspection has been scheduled.
Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/21/2019 | 11/22/2019 | 11/22/2019 | P | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok for cover.
Jonathan Phone #: ###-####
|