INSP-Sprinkler Rough-in | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PART |
Jim Page
|
|
|
Area marked with red ink on city approved drawings inspected, area marked is approved for cover.
Parcel in the open office area. Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
INSP-Sprinkler Rough-in | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for phase 5 where piping is ok to cover. I noted one missing brachline restraint that I can check for at the next inspection. ] Phone #: ###-#### Inspection requested via web by Brian Carlisle
|