INSP-Final Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | FAIL |
Jim Page
|
|
|
Secire insulation that is resting on and blocking upright sprinkler heads above ceiling grid.
johnathon Phone #: ###-####
|