INSP-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | P | PART |
Troy Cobbley
|
|
|
A temporary for this permit has been given for 90 days. To final this permit the new notification devices need to sync with the existing notification devices as per NFPA 72.
Contact is Dirk. Building has been tested and verified for synchronization. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | FAIL |
Troy Cobbley
|
|
|
Not all of the strobes have been modified to meet the minimum spacing requirements of NFPA 72. There are strobes on the exterior balcony that are not shown on the plans. They will need to be shown if they are powered from the new NAC panel.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | FAIL |
Troy Cobbley
|
|
|
No testing performed. During walk through I fould many of the strobes overspaced and areas missing notificaiton. Contractor needs to perform a walk through and modify coverage to meet min. code. Plans need to be resubmitted showing the changes for approval before the next scheduled inspection.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 2/5/2020 | 2/6/2020 | 2/5/2020 | P | CANC |
Troy Cobbley
|
|
|
Contact is Dirk. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|