INSP-Supply line flush | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
This inspection is scheduled for 9:00 AM. Jim Baker is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/3/2020 | 6/4/2020 | 6/4/2020 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for undergorund supply witnessed, no pressure loss observed at underground supply gauge.
Richard Clark is the contact(: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/31/2020 | 4/2/2020 | 4/1/2020 | A | CANC |
Jim Page
|
|
|
Talon is the contact. Thanks!(: Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 3/31/2020 | 4/2/2020 | 4/1/2020 | A | CANC |
Jim Page
|
|
|
Talon is the contact. Thanks for all your help(: Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
Bryan is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|